Year to Date ARC Report

Below is a list of the most recent updates which include requests to and decisions made by the Barefoot Resort Residential Association’s Architectural Review Committee.

January 1, 2025 – June 27, 2025

TYPE OF REQUEST NUMBER ARC DECISION
Color Change (Door) 5 Approved
Color Change (Home) 2 Approved
Color Change (Shutter) 4 Approved
Driveway Upgrades 4 Approved
Endless Swim Spa 1 Approved
Exterior Lighting 1 Conditional
Exterior Surface Replacement 1 Approved
Fence Installation 4 Conditional
Fence Removal 1 Approved
Foundation Repair 1 Approved
French Drains 1 Conditional
Front Door Replacement 1 Approved
Garage Door Color Change 1 Approved
Garage Door Replacement 1 Approved
Garage Wall Light Replacement 1 Approved
HVAC Minisplit 1 Conditional
HVAC Relocation 2 Conditional
Landscape Enhancement 8 Conditional
Monument Upgrades 1 Approved
Patio Enclosure 4 Approved
Patio Enlargement 1 Conditional
Pergola 2 Conditional
Privacy Fence 1 Disapproved
Roof Replacement 12 Approved
Solar Panels 1 Approved
Solar Tubes 1 Approved
Storm Door Installation 1 Approved
Swimming Pool Installation 1 Conditional
Trash Can Enclosure 2 Approved
Tree Removal 10 Conditional
Window Replacement 4 Approved
TOTAL 81

Recap Summary

Year to date, the ARC Committee has reviewed 81 applications.

Year-to-date application approval rate is 99% approved.

Please note that all applications are considered on a case by case basis and approved on the individual merit of the application.