Cabana Update
As previously communicated, Schindler elevators staging warehouse in Georgia was struck with a Tornado. Schindler has determined that the original delivery schedule will be met. Thus, the elevator will not negatively impact the construction schedule.
The plumbing and electrical rough ins along with the masonry is continuing and has hit no major problems or delays at this point. Meetings are being held with ADT to finalize electrical requirements for the security system.
The roof is continuing to be installed. To further protect the roof support system from the ocean environment, we are changing the insulation that was specified and replacing it with a spray on insulation that will seal the entire roof support structure from the environment.
Some delays with the delivery of metal framing have occurred. Baldwin is continuing to work around this constraint and continues to be on schedule.