Year to Date ARC Report

Below is a list of the most recent updates which include requests to and decisions made by the Barefoot Resort Residential Association’s Architectural Review Committee.

January 1, 2025 – September 26, 2025

TYPE OF REQUEST NUMBER ARC DECISION
Awning 1 Conditional
Color Change (Door) 5 Approved
Color Change (Home) 3 Approved
Color Change (Shutter) 4 Approved
Driveway Upgrades 5 Approved
Endless Swim Spa 1 Approved
Exterior Lighting 1 Conditional
Exterior Surface Replacement 1 Approved
Fence Installation 5 Conditional
Fence Removal 1 Approved
Foundation Repair 1 Approved
French Drains 1 Conditional
Front Door Replacement 2 Approved
Garage Door Color Change 1 Approved
Garage Door Replacement 1 Approved
Garage Wall Light Replacement 1 Approved
Garden Feature 1 Approved
Generator 1 Conditional
HVAC Minisplit 1 Conditional
HVAC Relocation 2 Conditional
Lanai Remodel/Replace 1 Approved
Landscape Enhancement 11 2 Approved, 9 Conditional
Monument Upgrades 1 Approved
Patio Door 1 Approved
Patio Enclosure 6 Approved
Patio Enlargement 2 Conditional
Pergola 2 Conditional
Privacy Fence 2 1 Conditional, 1 Disapproved
Retaining Wall 1 Conditional
Roof Replacement 19 Approved
Shutter Replacement 1 Approved
Solar Panels 1 Approved
Solar Tubes 1 Approved
Spa 1 Conditional
Storm Door Installation 2 Approved
Swimming Pool Installation 1 Conditional
Trash Can Enclosure 2 Approved
Tree Removal 18 Conditional
Window Replacement 5 Approved
TOTAL 117

Recap Summary

Year to date, the ARC Committee has reviewed 117 applications.

Year-to-date application approval rate is 99% approved.

Please note that all applications are considered on a case by case basis and approved on the individual merit of the application.